Wednesday, March 6, 2013

New kitchen - part 2

With most of the cabinets in the carpenter started assembling the cabinets. That took longer than expected. I think most of the men who worked in there shared the idea that real men don't look at instructions ... so they had to redo a few of the cabinets.

The cabinets are in 

And then the doors ... 

And handles ... 

 And storage ... loads of it!

One of the lazy susan - making maximum use of the corner. 

And pull out drawers ...

Then the appliances began to be set in:
 Oven and microwave oven ... (in the stupid corner). The other lazy susan is placed in that corner.

And the fridge!

It was now time to have the counter top people come and measure the counter top area. 

We did have some debates about the counter top. On one hand we wanted something good but we were not made of money so we landed on a laminate counter top with a stone look to it. When we want to replace it with a real stone or something else we can. 



And then it was done ... in my next kitchen post I will share more on how we solved our main problems with the old kitchen.

The new kitchen part 3

No comments:

Post a Comment